It concerns re-equilibration. Suppose you have two methods which run on the same column but they have different eluents that are both ready to go on a gradient pump. In the morning you run method 1 and in the afternoon you run method 2. Between finishing all your runs on method 1 and starting method 2, you have to equilibrate to the new eluent used for method 2. To automate equilibration in Clarity you can use 'Idle Time', found by going to 'sequence->options...'. The problem with this is that it puts an idle time before every run. If you only want one idle time to appear on the change of your method, this can't be done.
I propose that a new feature is put into the sequence window. Instead of using the 'idle time' function, we should be able to put in a step (a row) that doesn't have a vial number but serves as an equilibration step, with the new method in the method column. For example:
Code: Select all
SV EV .............. Method Name Equilibration time
--- ---- ------------- ----------------------
5 5 5 Method 1 ---
6 -- -- Method 2 30
7 6 6 Method 2 ---
. . . . .
. . . . .
. . . . .
Steven Saville.