Lenka,
Thanks, worked perfectly!!
Dan
Search found 2 matches
- Wed Aug 24, 2016 9:16 pm
- Forum: Discussing Clarity
- Topic: Operational Qualification
- Replies: 3
- Views: 4108
- Tue Aug 23, 2016 5:50 am
- Forum: Discussing Clarity
- Topic: Operational Qualification
- Replies: 3
- Views: 4108
Operational Qualification
I am trying to perform an operational qualification for a system consisting of two 5890 GCs with 7673 autosamplers. We are using digital control of the GCs. I am trying to verify the qualification prior to installation. Based on the manual, it does not sound like the GCs must be physically connected...